Case studies

Heron at sea
Generic Transport Systems – supporting RWM’s goal of geological waste disposal

The NTS M4/12 MOX fuel transport package has improved shielding and thermal performance.

Grebe7
UF6 shipment – optimising capacity on a PNTL vessel

NTS shielding assessors were asked to provide an assessment to justify the shipment of 120 UX-30B transport packages on board a PNTL vessel. Timescales were short plus the vessel had only previously been licensed to carry 40 of the packages.

road move 1648c
UK sealed radiation sources – delivering a new and cost-effective solution

The UK had an urgent requirement to collect a backlog of radiation sealed sources from across the country and transport them for safe disposal.

MOX fuel transport package
MOX fuel transport package – demonstrating package design innovation

The NTS M4/12 MOX fuel transport package has improved shielding and thermal performance.

1648c flask
Finite Element Analysis – securing new package licensing

Finite Element Analysis (FEA) work was required to support a new licence to transport the 1648C package.

German VRR
Shipment of high-level waste from the UK to Germany

Our expertise in shipping waste resulting from reprocessing was demonstrated when we completed the first of three shipments of high level waste to Germany at the end of 2020.

spent fuel agr
Keeping the lights on

DRS have provided a rail solution for the transportation of spent fuel on behalf of EDF Energy since 1998.

Georgemas railhead
Georgemas Junction

We have used our proven track record in the design, development, delivery and operation of rail infrastructure to support vital decommissioning activities at Dounreay.

007 DRS Passenger
Sellafield Workforce Transport

We’ve used our rail capabilities to reduce local disruption and improve efficiency at one of the UK’s largest industrial sites.